Condos above the downtown shops on Market Street and Front Street: one wall, one building
Celebration's downtown puts condos over the shops along Market Street and Front Street, and a condo install there is half wall work, half logistics. The wall first. A partition inside a downtown condo can be wood stud or metal stud, and the wall to the next unit is a rated assembly the installer does not drill through, so a 3/16-inch test hole settles the framing before the bracket plate goes up. Wood takes 5/16-inch lag bolts. Metal stud takes SnapToggles, four per bracket and six under a full-motion arm, because a lag strips thin steel. Each toggle needs a 1/2-inch hole, which the bracket plate hides. Then the building. Associations set working hours and may want notice before a contractor arrives, and an in-wall cable run through a shared wall needs the association's yes. A paint-matched raceway avoids that question. The van parks where downtown allows, so a 75-inch panel is a two-person carry, measured against the stair turn first. Celebration townhomes share a party wall the same way, and the TV goes on one of the other walls when it can. Condo installs downtown run 60-90 minutes.