Teardown rebuilds off downtown Downers Grove: what the new walls hide
The teardown-and-rebuild wave near downtown Downers Grove has put a lot of 2005-and-later houses on 1900s lots, and new construction is not automatically easy. Engineered studs sit at 16 inches until a header, a beam pocket or a chase interrupts the rhythm. Structured wiring, PEX runs and steel nailing plates crowd the first bay beside a door, and a plate will stop a lag bolt cold or, worse, let it pass and nick a water line. Your installer treats a rebuild like a hundred-year-old house: scan, magnet, probe, then drill. Where a builder left blocking, we use it, after verifying it is real lumber and not plywood tacked behind the drywall. Cable routing is the best part of these houses, because an empty bay with no fire blocking lets a fish tape drop 6 feet in one pass. Ceiling height is the other variable: a 12-foot great-room wall pushes the bracket up, so we set height off the seated eye line and let 5 to 10 degrees of tilt fix the geometry. Rebuild installs run 60 to 90 minutes.