Solterra new construction and what the builder left inside the wall
Solterra on the south side of Mesquite is 2020s tract construction, and the walls are the easiest in the city to work: flat drywall, straight studs on honest 16-inch centers, and on many plans a recessed media box with a conduit sleeve already behind the intended TV location. Where that sleeve exists, concealment stops being a fish job and becomes a fifteen-minute pull. Where it does not, the two-story sections have mid-wall fire blocking that fish tape has to be worked around. The other new-build wrinkle is height. Open great rooms in these houses invite a mount 9 or 10 feet up above a stone veneer accent band, which means a taller ladder, a second person on an 80-inch panel, and a 10 to 15 degree downward tilt so nobody in the room is craning after twenty minutes of a movie. Anchors land in stud through the drywall, or through the veneer into framing where the accent band crosses, and only that stone section carries the +$99 surcharge. Solterra installs run 45 to 75 minutes.