Cultured stone and gas inserts in the Estates section
Estates section customs put the fireplace on the main wall and wrap it in cultured stone, often with a raised hearth, and the TV is going above it. Heat comes first. We run the insert at full burn for 20 minutes and read the surface with an infrared thermometer; stone over a decorative gas insert typically settles between 88 and 102°F, and anything hotter pushes the bracket higher or onto a pull-down arm so the screen drops to eye level for a movie. Anchoring next. Cultured stone is a thin veneer over scratch coat and lath, roughly an inch, so the bracket has to reach wood. We drill a mortar joint with a 3/16-inch bit, step up, then drive 5-inch lag bolts into the stud, four per plate on anything over 70 inches. Where a joint lands away from framing, a Tapcon set in solid stone carries that corner. Stone triggers the published +$99 masonry surcharge. Cable rides a paint-matched raceway on the adjacent drywall, never a chase cut through the veneer. Allow 90 to 120 minutes.